Start with the decision

Screen a Canadian commercial energy project.

Start with the site's load, tariff, and constraints. Use the screen to identify the questions for a study, then export the evidence as a brief.

Commercial modeSwitch to residential

01 / Inputs

Define the commercial site

Reviewed NRCan annual PV potential, south-facing at latitude tilt.
Context only. This choice does not silently alter the capacity calculation.
Information for the brief only. Financing costs and contract pricing are not modelled.
kWh/year
Use one complete year, or leave blank and enter all 12 monthly values below.
Enter 12 monthly electricity-use values instead
kWh
kWh
kWh
kWh
kWh
kWh
kWh
kWh
kWh
kWh
kWh
kWh
Optional. Enter area after known setbacks and obstructions.
kWdc
Optional. The model uses the lowest stated capacity bound.
CAD/kWh
User-entered import energy value. Enerwav does not insert a province default.
Export and rate context
Optional label from the selected utility tariff.
Use this only when no energy is expected to export. Otherwise enter both export inputs.
%
Enter only with an explicit export credit.
CAD/kWh
Leave blank to keep export value suppressed.
Installed cost and operating assumptions
CAD/Wdc
User-entered lower or single installed-cost assumption.
CAD/Wdc
Optional. Blank uses the entered installed cost as both boundaries.
CAD
Alternative to CAD/Wdc. Do not enter both cost methods.
CAD
Optional upper total-cost boundary.
CAD/year
Required for discounted cash flow. No universal O&M default is applied.
CAD/year
Optional upper O&M boundary.
The screening view is fixed at 25 years. Financing structure is informational.
%
Visible user assumption. No hidden discount rate is applied.
%/year
Visible user assumption. Enter zero to hold value flat.
%/year
Editable preliminary NREL-derived assumption. It is not a guarantee.
Storage upper-bound screen
Presets set nameplate values only. They do not create annual savings.
kW
Nameplate discharge power.
kWh
Nameplate energy.
%
Visible editable efficiency convention.
hours
Duration used for the energy-limited clipping bound.
kW
Optional target limit.
kW
Optional observed peak limit.
CAD/kW-month
User-entered tariff demand charge.
months
Whole number from 1 to 12.
CAD/kWh
Entered cost of charging energy.
CAD/kWh
Entered value of discharged energy.
cycles/year
Annualization remains withheld without the confirmations below.
Commercial ITC and CCA screen

These questions screen the Clean Technology ITC and Class 43.1. They do not establish tax eligibility or filing treatment.

CAD
User-entered lower or single basis. Never assumed from total cost.
CAD
Optional upper basis boundary.
CAD
Entered assistance reduces the screened ITC basis.
%
Required only to screen tax savings.

Choose a mode and enter site information to begin.

Reviewed Canadian evidence

Explore sourced Canadian projects

Project records separate sourced claims from unknown fields and retain evidence grades.

ProjectPlaceTypeEvidence
EPCOR Smart Grid System at E.L. Smith Water Treatment PlantEdmonton, Albertasolar-plus-storageNatural Resources Canada
Summerside SunbankSummerside, Prince Edward Islandsolar-plus-storageCity of Summerside
Oneida Energy StorageHaldimand County, OntariostorageOneida Energy Storage Limited Partnership

View all projects